Start with the full input range, required output, load profile, noise budget, efficiency target, startup behavior, and accuracy boundary. No current threshold picks a topology for every board.

Written and verified by John Merton · verified 2026-07-14

Short answer

Step-down; linear loss and headroom are acceptable

Evaluate a linear regulator.

Verify worst-case dropout, ground current, output-capacitor rules, reverse-current behavior, and junction temperature for the exact part.

Step-down; linear loss or headroom is unacceptable

Evaluate a buck converter.

Check the efficiency curve at your VIN, VOUT, and load, then verify minimum on-time, current limits, magnetics, ripple, layout, and thermal margin.

Step-up

Evaluate a boost converter.

Translate input power and inductor or switch current into deliverable output current at the real conversion ratio and efficiency.

Precision measurement rail

Evaluate a voltage reference, not a load regulator.

Budget initial accuracy, temperature drift, line and load regulation, noise, headroom, and the reference's source and sink limits.

Write the rail contract before choosing topology

Nominal voltage and headline current are not a design brief. Record these boundaries at the same operating corners so a pleasant typical number cannot hide the actual failure mode.

Input
Full VIN range at the regulator pins, including tolerance, droop, startup ramp, surge, and other transients.
Output
Required VOUT and tolerance at the load after regulation, distribution drop, ripple, and transient response.
Load
Sustained current, transient current, duty cycle, sleep current, and any reverse-current path.
Headroom
Worst-case VIN − VOUT compared with guaranteed dropout or converter operating limits at load and temperature.
Noise
Permitted ripple, switching spectrum, PSRR needs, and whether light-load pulse skipping is acceptable.
Idle budget
Quiescent current, shutdown current, and control-pin leakage across every operating state.
Startup
Soft-start, inrush, pre-biased output behavior, sequencing, enable thresholds, and source impedance.
Thermal and package
Ambient, airflow, copper, vias, neighboring heat, package resistance, assembly limits, and derating.

Linear regulator: stop when headroom or heat fails

A linear regulator can be simple, quiet, and useful when VIN stays above the guaranteed dropout boundary and the board can reject the heat. Estimate regulator loss as PD ≈ (VIN − VOUT) × ILOAD + VIN × IGND. Then translate that loss through a defensible thermal model instead of trusting the package current rating.

Use the linear-regulator thermal calculator for the operating point. For a current low-dropout example, AP2112K-3.3TRG1 specifies 250 mV typical / 400 mV maximum dropout at 600 mA; the rail still must stay above 3.3 V plus the worst-case dropout at the actual load and temperature. The AMS1117-3.3 is a higher-dropout bounded example with 1.1 V typical / 1.3 V maximum dropout at 0.8 A, milliamps of ground current, and a characterized output-capacitor requirement. Those numbers belong to those exact parts, not every linear regulator.

Buck converter: evaluate the real operating point

A buck converter is the step-down candidate when linear headroom or dissipation fails. Do not compare datasheet “up to” efficiencies across mismatched VIN, VOUT, load, switching mode, inductor, and board conditions. Read the curves and test conditions that match your rail, then verify minimum on-time, current-limit behavior, magnetics, capacitor bias, ripple, EMI, layout, startup, and thermal derating.

Browse the verified buck-converter surface. For one bounded design point, the AP63203WU-7 is a fixed 3.3 V synchronous buck whose verified record covers a 3.8 V to 32 V recommended input range, 2 A continuous output claim, light-load PFM behavior, and exact external-component and layout requirements. It is an example to evaluate, not a default for every step-down rail.

Boost converter: switch current is not output current

A boost converter is the step-up candidate, but an inductor-current or switch-current limit is not the deliverable output-current rating. Output capability changes with VIN, VOUT, efficiency, component loss, current-limit method, temperature, and startup conditions. Calculate input and peak currents at the worst conversion ratio; do not copy the switch-current headline into the load budget.

The deliberately narrow boost-converter category currently has one verified example: TPS61200DRCR. TI specifies a 0.3 V operating floor after startup, a separate 0.5 V maximum startup threshold, and a 1200 mA minimum / 1500 mA maximum average inductor-current limit. None of those numbers alone promise a load current.

Voltage reference: accuracy is the job; load power is not

An ADC, DAC, or measurement chain may need a reference whose initial accuracy, drift, line regulation, load regulation, noise, hysteresis, and aging fit an error budget. That is a different job from powering digital or analog loads. The REF3033 is a 3.3 V series reference with 0.2% maximum initial accuracy at 25 °C and 75 ppm/°C maximum drift over −40 °C to +125 °C for the plain REF30 grade. Its 25 mA source-only boundary does not make it a general-purpose 3.3 V load regulator.

Bounded decision examples

5 V to 3.3 V, moderate load

Run worst-case dropout and the linear loss equation with the real load and package thermal path. If both pass with margin, a linear part remains a candidate. If either fails, evaluate a buck at that same operating point.

Use the 3.3 V LDO-vs-buck comparison to screen both operating models against one rail contract.

Single cell to a higher rail

A boost topology fits the direction, but startup voltage under source impedance and peak inductor current can fail before nominal power math does. Check both boundaries against the exact converter.

ADC full-scale reference

Start with the total accuracy and drift budget, then verify source/sink behavior and dynamic load. A precise reference can be right for the converter reference pin and wrong for the rest of the board.

Continue into exact parts

Use the voltage-regulator category to compare verified linear regulators and references after the topology survives the rail contract.

Design the whole rail sequence

The PCB power-tree design guide connects conversion, protection, sequencing, measurement, layout, and bring-up across the complete board.

Common questions

When should I use a linear regulator instead of a buck converter?

Evaluate a linear regulator when the step-down is acceptable at linear loss and headroom. Estimate dissipation as PD ≈ (VIN − VOUT) × ILOAD + VIN × IGND, then verify worst-case dropout, ground current, output-capacitor rules, reverse-current behavior, and junction temperature for the exact part before committing to the topology.

When should I use a buck converter instead of a linear regulator?

Evaluate a buck converter when linear loss or headroom is unacceptable for the step-down. Check the efficiency curve at your actual VIN, VOUT, and load rather than a datasheet's "up to" number, then verify minimum on-time, current limits, magnetics, ripple, layout, and thermal derating before choosing a part.

When do I need a boost converter instead of a step-down topology?

Evaluate a boost converter for step-up rails. An inductor-current or switch-current limit is not the deliverable output-current rating—output capability changes with VIN, VOUT, efficiency, component loss, current-limit method, temperature, and startup conditions. Calculate input and peak currents at the worst conversion ratio before trusting the switch-current headline.

When should I use a voltage reference instead of a regulator?

Choose a voltage reference, not a load regulator, for a precision measurement rail such as an ADC or DAC. Budget initial accuracy, temperature drift, line and load regulation, noise, headroom, and the reference's source and sink limits—a reference's accuracy job is different from powering digital or analog loads.

Official manufacturer sources used by the examples

Official URLs retrieved again on 2026-07-14. Recheck the current revision, exact orderable, and operating conditions before production use.

Found an error? Submit a correction — we verify every correction against the manufacturer’s datasheet.